摘要:工程造价一直以来都是建筑工程管理的主要内容之一,也是建筑行业中涉及有关各方经济利益的焦点,而工程造价管理分为四个阶段:投资决策阶段、项目招投标阶段、项目施工阶段和竣工结算阶段,这些阶段直接关系到工程项目的造价控制,但在施工阶段的工程造价管理尤为复杂和困难,要从根本上解决工程造价问题,就应该着重监控好施工阶段的造价管理体系,这样才能提高建筑投资工程的效益。
关键词:建筑工程;造价管理;施工阶段
Abstract: Fabrication costs of the project have all been one of the main contents of engineering management of buildings all the time, involve having in the building trade too Close the focus of each side’s economic benefits, and project fabrication cost management is divided into four stages: Investment decision stage, project bid steps Period, project construction stage and completing settlement stage, fabrication cost concerning the project directly the stage is controlled, but is constructing The project fabrication cost at stage of the worker is particularly complicated and difficult in management, solve the fabrication cost problem of the project fundamentally, should supervise emphatically Accuse of the fabrication cost management system at stage of good construction, could improve benefit of the investment project of the building in this way.
Key words: Construction work; The fabrication cost is managed; Construction stage
近十几年来,我国经济发展速度惊人,在这样高速发展的社会当中,建筑行业如果要继续保持自身优势,保持国民支柱产业之一的重要地位,就要加强自身的建设和管理,与世界建筑行业接轨,将先进的管理技术和生产技术引进国内,才能得到长足的发展。而在激烈的市场竞争中,建筑行业要获取更大的利润空间,就应该对工程造价进行严格的监控和有效的管理,特别要对施工阶段的投资控制给予足够的重视,才能实现整体投资控制的目标。本文主要分析现今建筑工程在施工阶段存在的造价管理问题和不足,探讨完善工程造价管理和控制的方法。
1施工阶段工程造价控制和管理的重要性
工程造价控制与管理是集技术、经济、管理于一体的综合性的工作,虽然工程造价最有效的控制阶段是在设计阶段,因为设计阶段是对整体项目工程的规划和预计,所以尤为重要,很多人也认为把造价控制和管理工作的重心放在施工阶段上,不能有效地节约投资的资金和材料,实现利润最大化的可能性极小,但是,这正是本文要探讨的一个行业盲点,正因为许多施工部门忽视了对施工阶段的造价进行控制,从而导致了额外施工费用