There were plenty of opportunities for innovation. “The International Space Station program, managed by NASA, was going through painful changes due to its inherent complexity as well as significant budget problems that forced almost continuous design changes and interface realignments,” Abramovici says. “The changes affected everything, from SPDM interfaces to the way to robot was to be used in space.”

The system engineering team focused on finding ways to integrate to evolving SPDM into the changing Internal Space Station architecture while minimizing the impact on the product. The results speak for themselves: Very few out-of-scope changes appeared through the life of the project.

“The requirements were extremely well thought out at the beginning,” Gowans says. “There were no soft requirements, and that made it easier to put a plan in place that was achievable both cost- and schedule-wise. Nailing down those requirements is key in a fixed-price job.”

Major internal risks arose from the introduction of new, untested technologies into the design, by the sheer geometrical complexity of the mechanical and electrical packaging. MD Robotics design engineers and quality-assurance personnel were onsite for extended critical time periods.

此文章共有17页  上一页 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 下一页

文章来源:中国项目管理资源网

发表评论    【推荐】 【打印
我来评两句 查看最新评论〗 
请您注意:
·遵守中华人民共和国的各项有关法律法规
·承担一切因您的行为而导致的法律责任
·本网留言板管理人员有权删除其管辖留言内容
·您在本网的留言,本网有权在网站内转载或引用
·参与本留言即表明您已经阅读并接受上述条款
昵称: 匿名
 
图片广告
热点文章
论坛精贴